We are making progress on the house


The 38' long main carrying beam in the Huber house is on a symbolically north south axis and splits the house roughly in half east and west. The beams shown suggested a heavy timber peace sign which was documented before the floor framing I-joists were installed.

A few days later with most of the joists installed the sub flooring has started. By the time you see this post the sub floor will have been completed. Check the site out soon to see actual walls going up. The students in the Building Program are really coming up to speed as they are starting to see real progress from their efforts.