
Windows are starting to go in. The rest of the windows and the front door will be delivered early January. The 3 panel solar hot water collectors are visible at the far right. Some of the metal roof is on(up at the 2 clerestory windows) and ice and water shield is in place on most of the rest of the roof. The poly tent covering the chimney along with a heater keeps the mortar from freezing until it sets up. Look for a new posting late January.